BP probe spreads blame for Gulf oil spill
photos by Reuters
The report was generated by a BP team led by Mark Bly, BP's head of safety and operations.
BP's report is far from the final word on possible causes of the explosion, as several divisions of the U.S. government, including the Justice Department, Coast Guard and Bureau of Ocean Energy Management, Regulation and Enforcement, are also investigating.
Also, a key piece of the puzzle — the blowout preventer that failed to stop the oil from leaking from the well off the Louisiana coast — was raised from the water Saturday. As of Tuesday afternoon, it had not reached a NASA facility in New Orleans where government investigators planned to analyze it, so those conclusions were not be part of BP's report.
The April 20 rig explosion killed 11 workers and led to 206 million gallons of oil spewing from BP's undersea well.
Investigators know the explosion was triggered by a bubble of methane gas that escaped from the well and shot up the drill column, expanding quickly as it burst through several seals and barriers before igniting.
But they don't know exactly how or why the gas escaped. And they don't know why the blowout preventer didn't seal the well pipe at the sea bottom after the eruption, as it was supposed to.
The details of BP's internal report were closely guarded — and only a short list of people saw it ahead of its release.
There were signs of problems prior to the explosion, including an unexpected loss of fluid from a pipe known as a riser five hours before the explosion that could have indicated a leak in the blowout preventer.
Witness statements show that rig workers talked just minutes before the blowout about pressure problems in the well.
At first, nobody seemed too worried, workers have said. Then panic set in.
Workers called their bosses to report that the well was "coming in" and that they were "getting mud back." The drilling supervisor, Jason Anderson, tried to shut down the well.
It didn't work. At least two explosions turned the rig into an inferno.
Members of Congress, industry experts and workers who survived the rig explosion have accused BP's engineers of cutting corners to save time and money on a project that was 43 days and more than $20 million behind schedule at the time of the blast.
In its report, BP defended the well's design, which has been criticized by industry experts.
"The investigation team reviewed the decision to install a 97/8 in. x 7 in. long string production casing rather than a 7 in. production liner, which would have been tied back to the wellhead later, and concluded that both options provided a sound basis of design."